This Evergreen//One Product Guide (“Product Guide”) provides descriptions of available Subscription Service and the applicable service level agreements (each an "SLA") associated with all Evergreen//One subscriptions commencing August 18th, 2025.

End User must satisfy the following environmental requirements for any Subscription Service and in order to be eligible for any applicable service level agreements as further detailed in this Product Guide.

Environmental Requirements

. For best performance, FC or NVMe-oF for UBF and NFSv3 for UFFO are recommended.

Workloads?balanced across all Service Infrastructure within a License, with each at 80% utilization or higher as described in Pure1.

Pure Edge Services and all required Agents are enabled.

Service Infrastructure is kept up to date as per the .

High line AC power (200-240V) and sufficient rack space to support capacity expansions.

Slide

1.? ?SUBSCRIPTION SERVICE AND MINIMUM GUARANTEED PERFORMANCE:

SUBSCRIPTION SERVICE

GUARANTEED PERFORMANCE DENSITY1

MINIMUM GUARANTEED PERFORMANCE

LATENCY GOAL5

UBF Performance2

8 MB/s per TiB or 500 IOPS/TiB

1 GB/s or 62,500 IOPS

1ms

UBF Premium2

24 MB/s per TiB or 1500 IOPS/TiB

2 GB/s or 125,000 IOPS

1ms

UBF Ultra2

48 MB/s per TiB or 3000 IOPS/TiB

3 GB/s or 187,500 IOPS

1ms

UBF Capacity

1.6 MB/s per TiB or 100 IOPS/TiB

Varies based on throughput provisioned by End User

5ms

UBF Adaptive2

Varies based on throughput provisioned by End User

Varies based on throughput provisioned by End User

5ms

Cloud Block Store2

Varies based on configuration selected by End User

Varies based on configuration selected by End User

N/A

UFFO Adaptive3

Varies based on throughput provisioned by End User

Varies based on throughput provisioned by End User

N/A

UFFO Standard3

10 MB/s per TiB

1.5 GB/s

N/A

UFFO Performance3

20 MB/s per TiB

3 GB/s

N/A

UFFO Premium3

50 MB/s per TiB

5 GB/s

N/A

UDR B&F3

.5 MB/s per TiB

N/A

15ms

UDR F&O3

1 MB/s per TiB

N/A

N/A

Evergreen//One for AI4

Varies based on read throughput provisioned by End User

Varies based on read throughput provisioned by End User

N/A

Slide
  1. Actual guaranteed performance is the greater of: (a) performance density multiplied by the higher of Reserve Commitment or Effective Used Capacity measurement or (b) the Minimum Guaranteed Performance.
  2. Guaranteed performance values for UBF subscriptions are based on a 70:30 R/W workload. A subscription delivers its guaranteed performance if it is able to achieve at least one of the specified MB/s or IOPS values, depending on block size, for that Subscription Service.?
  3. Guaranteed performance values for UFFO subscriptions are based on 70:30 R/W workload with a minimum access size of 256KB at full concurrency for NFSv3.
  4. Guaranteed performance values for Evergreen//One for AI subscriptions are based on 100% read workloads with a minimum access size of 256KB at full concurrency for NFSv3.
  5. Latency goal describes maximum storage service latency target for workloads up to the Guaranteed Performance level.

2.? ?SERVICE LEVEL AGREEMENTS

PERFORMANCE

Meets Expected Performance1

Not Met/Month3

Service Credit or Daily Rate

99.9999%2

>2.6 Secs

3%

99.999%

>26 Secs

5%

99.99%

>4.4 Mins

10%

99.95%

>21.9 Mins

25%

99.9%

>43.8 Mins

100%

Slide
  1. All Systems in the License must be fully utilized.
  2. Calculated at the License level on a monthly basis as follows:
    Availability = (Total Seconds in Calendar Month) - (Time in Seconds Performance Not Met) / Total Seconds in a Calendar Month.
    Note: Due to bandwidth and logging overhead considerations, all IOPS and MB/s samples are measured and reported in 30 second averages.
  3. Any 100% Service Credits are prorated for the number of days that Performance is not met.? For example, if Performance is 100% unavailable for two (2) whole days. End user receives a 100% License Daily Rate credit for those two days in the month.

UPTIME1

Uptime2

Downtime/Month

Service Credit of Monthly Invoice3

99.9999%2

>2.6 secs

3%

99.999%

>26 secs

5%

99.99%

>4.4 mins

10%

99.95%

>21.9 mins

25%

99.9%

>43.8 mins

100%

Slide
  1. Uptime percentage is calculated at the License level based on 24 hours a day,?across a fully completed calendar month, calculated as follows:
    Uptime Percentage = (Total Seconds in Calendar Month) - (Downtime/Seconds) / Total Seconds in a Calendar Month.
  2. Routine controller failovers are excluded from the calculation. UDR & UBF File access centric connections with intrinsic protocol timeout characteristics
    are excluded from the uptime calculation if native protocol implementation does not support service failovers.
  3. For any Service Credit to apply, (i) the applicable System must have been active and running for the completed service month preceding the outage;
    and (ii) host multipathing must be set up for best practices.

Zero Planned Downtime1

Uptime During?Maintenance

Downtime/Month

?

Service Credit of Monthly Invoice

100.00%

> 0 seconds

100%2

Slide
  1. All Licenses are delivered with zero planned downtime and no disruption to the SLAs, for Purity upgrades and any Service Infrastructure expansions
    or upgrades as performed by Pure, and therefore End User may be entitled to a Downtime Credit equal to 100% of the monthly charges for the
    corresponding Effective Used Capacity on any System that experiences Planned Downtime.
  2. May not apply to: (a) End User-driven Service Infrastructure moves, data center maintenance or shutdowns; (b) issues arising out of any equipment,
    software, or any other?technology neither owned?nor supplied by Pure; or (c) issues arising out of Pure’s reasonable control. Routine controller failovers
    are automatically excluded from uptime calculations. UDR & UBF File access centric connections with intrinsic protocol timeout characteristics
    are excluded from the uptime calculation if native protocol implementation does not support service failovers.

Buffer Capacity1

Capacity Not Available/Days in
Service Month3

Service Credit of Monthly Invoice2

≥1 day

3%

≥3 days

5%

≥5 days

10%

≥7 days

25%

≥14 days

100%

Slide

1. End User will receive 25% buffer capacity over the then-current Effective Used or Reserve Commitment (whichever is higher), up to 1PiB, in increments up to
100TiB at a time.?End User must provide its On-Demand forecast to Pure for provisioning additional capacity ahead of usage exceeding 80% of the Reserve
Commitment as a condition of Pure?meeting this SLA.
2. All Systems in the License must be fully utilized, and End User must cooperate with Pure in the timely deployment of buffer capacity.
3. Service Credits are prorated for the number of days that Service Infrastructure does not have sufficient capacity to support host or Purity replication operations.
For example, if capacity is unavailable for two (2) whole days, End User receives a 3% credit for that service month.

NO DATA MIGRATIONS SLA

Under the “No Data Migrations SLA”, Pure guarantees that Pure will non-disruptively upgrade the Applicable Service Infrastructure, and that the upgrade will not require any data migration.? To the extent Pure determines that Applicable Service Infrastructure requires a data migration in lieu of a non-disruptive upgrade, Pure will provide a Service Credit provided that the subscription satisfies the below criteria. The Service Credit is based upon the Service?Charges for any Service Infrastructure within a License requiring data migration. The Service Credit will be equivalent to the number of months that End User has already consumed its Evergreen//One subscription, but not exceed 12 months,?provided that the subscription satisfies the following criteria:

NO DATA MIGRATIONS SLA*

No Migration SLA

Upgrade Performed by Pure or Pure Authorized Partner

End User is not past due with any invoices

Service Infrastructure complies with the Evergreen//One Upgrade Policy

Slide

*This program excludes any upgrade that involves consolidating Systems or movement across groupings of Subscription or Subscription Services.

ZERO DATA LOSS SLA

Under?the "Zero Data Loss SLA," Pure guarantees no data loss within its Service Infrastructure. If data loss occurs, Pure will first offer Data Recovery Services to attempt to recover the lost data. If, after assessment, it is determined that the data loss was due to a fault in the Service Infrastructure (excluding Excluded Products), and the data is deemed unrecoverable following these recovery efforts, Pure will issue a Service Credit to the End User. This credit will be based on the Usage Charges for the affected system and will reflect the number of months the End User has utilized its Evergreen//One Subscription on that Service Infrastructure, capped at 12 months. The Service Credit will be the End User's sole remedy and Pure's exclusive liability for any data loss related to an Evergreen//One subscription. It does not exempt the End User from adhering to industry standards for managing snapshots, backups, and data protection.

DATA RECOVERY SERVICES

Pure will (a) deploy personnel as reasonably required in Pure’s option, to recover any data that Pure has determined was lost due to a Pure Service Infrastructure being at fault; (b) ship (at its sole cost and expense) any hardware required to recover any lost data or otherwise ensure no further data loss; and (c) reconfigure any replacement defective eligible hardware; and decommission and remove any replaced Eligible Hardware.

PAID POWER & RACK SERVICE LEVEL AGREEMENT

Pure pays End User the cost of power consumed and rack space?required by the Service Infrastructure deployed to deliver the Reserve Commit and applicable SLAs during the initial Service Term but no longer than five (5) years. The End User must meet the requirements specified below from the Subscription Start Date.?The amount of the payment is determined by: (a) Rack units estimated to be required for the Service Infrastructure that will deliver the Reserve capacity, multiplied by a fixed unit cost based on best efforts estimate as determined by Pure, and (b) the nominal power consumption by the Service Infrastructure measured in Kilowatt-Hours, multiplied by the unit electricity costs for the Service Installation location(s) country, as published by the International Energy Agency (https://www.iea.org/). End User must provide the payment instructions to Pure prior to the Subscription Start Date, in order to receive this payment. Any payments due under the Paid Power & Rack program cannot be converted into additional discounts.

Paid Power and Rack Availability

Eligibility

Subscription Service

Reserve Commit Size

UBF - Performance

200 TiB

UBF - Premium

200 TiB

UBF - Ultra

200 TiB

UBF - Capacity

400 TiB

UBF - Adaptive

400 TiB

All UFFO Services

400 TiB

UDR B&F

500 TiB

UDR F&O

1,500 TiB

Evergreen//One for AI

30 GB/s

Slide

ENERGY EFFICIENCY SERVICE LEVEL AGREEMENT

Subscription Service

?

Watts3/TiB

(not to exceed numbers)

Minimum Reserve

UBF Performance

3W / TiB

300 TiB

UBF Premium

6W / TiB

300 TiB

UBF Ultra

10W / TiB

300 TiB

UBF Capacity

2W / TiB

500 TiB

UBF Adaptive

300W/GB/s
1.5W/TiB4

500TiB

UFFO Adaptive

175W/GB/s
3W / TiB4

500 TiB

UFFO Standard

3W / TiB

500 TiB

UFFO Performance

4W / TiB

500 TiB

UFFO Premium

4W / TiB

500 TiB

UDR B&F

2W / TiB

500 TiB

UDR F&O

3W / TiB

1500 TiB

Evergreen//One for AI

100W / GB/s
7W / TiB4

30 GB/s

Slide
  1. End User will experience the applicable power consumption per License, as set forth in this table. License must commence with greater than initial commitment specified in table above.
  2. Energy Efficiency SLA also does not apply to (a) Pure hardware purchased or transferred over from the End User; or (b) custom or non-standard configurations
    to the Service Infrastructure.
  3. Watts are based on the average of actual power consumed over a completed service month as reported by Pure. For purposes of calculating energy
    efficiency, “TiB” means either the Reserve Commitment plus the 25% Buffer, or the Total Estimated Effective Usable (Usable * PRE Ratio) capacity for
    the applicable Systems in the Subscription, whichever is greater. NOTE: Watts/TiB for UBF subscriptions including pre-encrypted or pre-compressed data measured as having a PRE ratio lower than 2:1 are 2x the numbers in the table above.
  4. The higher value applies depending on End User’s consumption.

SERVICE CREDITS FOR ENERGY EFFICIENCY SERVICE LEVEL AGREEMENT

Average Watts/TiB in completed
Service Month

Service Credit of
Daily Rate

≥1 day

3%

≥3 days

5%

≥5 days

10%

≥7 days

25%

≥14 days

100%

Slide

3.???INCLUDED WITH ALL SUBSCRIPTIONS.? All Evergreen//One subscriptions include the Evergreen//One RACI and the Evergreen//One Included Services Description.

4.? ?GENERAL TERMS. This Product Guide supplements the Pure End User Agreement (or other written agreement covering the same subject matter executed by Pure) for the applicable subscription purchased by End User. Capitalized terms not specifically defined in these Terms have the same meaning as in the End User Agreement.

5.?? ??PRIOR VERSIONS.

Last Updated August 18, 2025

Your Browser Is No Longer Supported!

Older browsers often represent security risks. In order to deliver the best possible experience when using our site, please update to any of these latest browsers.